Laboratory & Educational Solutions
Designed. Built. Equipped.
UAE specialist in the design, build, supply and maintenance of laboratories and specialist learning spaces for schools, colleges and universities.
Design & build Building a New Lab? From empty room to working lab: layout, furniture, services and safety, all handled by us. Supply Stocking Your Lab? Beakers to robotics kits across 13 categories, quoted within 24 hours.School of Modern Skills, Dubai
Our Clients
Trusted by Leading Institutions
School groups, schools and universities across the UAE.
Who We Are
A UAE Specialist in Laboratories and Educational Spaces.
Your one partner for laboratory design, build and supplies across the UAE, serving schools and institutions since 2011.
More About UsWhat We Do
From First Drawing to Final Practical.
- 01
- 02
- 03
We survey the rooms and plan every bench, fume cupboard and service around your curriculum, with layout drawings and 3D visuals you approve first.
Lab Design →Benches, casework, fume cupboards, gas, water and power, installed and handed over by one team.
Lab Build →Apparatus, glassware, chemicals and consumables for every lab, so it is ready for its first practical.
Browse the Catalog →After handover, we service fume hoods and eyewash stations and restock every year. Maintenance →
General Arrangement · 1:100
Spaces We Deliver
Science Labs, and Beyond.
Selected Work
Proven at Scale with UAE School Groups.
How We Work
From Empty Room to Working Lab.
Five steps, one point of contact. You always know what happens next, and what we need from you.
See the Full Process
Step 01 of 05
Consult
We visit the school, take the brief and measure the room: curriculum requirements, class sizes, the practicals you run and existing services.
- You get
- An agreed brief and room survey.
- We need from you
- Access to the room, a contact person and any existing drawings.
Step 02 of 05
Design
Layout drawings and 3D visuals, plus an itemised proposal covering furniture, services, safety systems and equipment.
- You get
- Drawings, photoreal 3D visuals and a clear, itemised proposal.
- We need from you
- Feedback from the people who will use the room.
Step 03 of 05
Approve
Drawings, finishes and samples are signed off before production starts. You see and touch worktop and cabinet samples, and choose your colours.
- You get
- Final drawings, a confirmed specification and a programme.
- We need from you
- Sign-off and a purchase order.
Step 04 of 05
Build
We deliver the furniture, connect the services and install everything on site, coordinated as one programme.
- You get
- Regular progress updates from one project contact.
- We need from you
- Site access and coordination with school operations.
Step 05 of 05
Hand Over
We snag every item, stock the equipment, walk staff through the room and stay on hand for after-sales support.
- You get
- A ready-to-teach room, a staff walkthrough and ongoing support.
- We need from you
- Time with the teachers and technicians who will use the lab.
Why King Kraft
What Schools Get Working with Us.
See It Before It's Built
Drawings and photoreal 3D visuals for every project, so you approve exactly what you get.
Built for School Use
Rooms planned around how teachers, technicians and students really work, and the safety rules they follow.
Stock Held in the UAE
A local warehouse with ready stock shortens lead times compared with import-only suppliers.
One Partner, Start to Finish
Design, build, equipment and support under one contract and one point of contact.
Equipment & Consumables
Curriculum-Ready Supply, Stocked in the UAE.
- Physics apparatus
- Chemistry apparatus
- Biology and microscopy
- Glassware and plasticware
- Chemicals, with SDS
- Models and charts
- D&T tools and materials
- Food tech and textiles
- STEM and robotics kits
- Lab safety and PPE
No online checkout: add products to your quote cart and we reply with a formal quotation within 24 hours.
Open the Catalog








